| City of Santa Maria - East Betteravia Road |
Retaining Wall Formed and Ready to Pour
|
Signal Upgrades and Trench Slurry
|
Retaining Wall Excavation
|
Asphalt Concrete Paving @ N. Bradley Rd. & Betteravia Rd.
|
Retaining Wall Backfill
|
Retaining Wall Backfill
|
|
East Betteravia Rd Widening and Betteravia and Blosser Road Traffic Signal Interconnect
|
| City of Santa Maria - Hanson Way Reconstruction |
|
Reconstruction of Hanson Way from West Stowell Road to West Main St. The work includes pulverizing, excavation, removal of sub-grade, re-grading, and asphalt paving.
|
Puliverization of Existing Roadway
|
Subgrade Preparation
|
Reconstruction of Roadway
|
Installation of Asphalt Concrete
|
|
| City of Santa Maria - Morrison Ave. & McClelland St. |
Morrison Ave.
|
McClelland St.
|
McClelland St.
|
|
|
Reconstruction of Morrison Ave. between Broadway & Miller St. and McClelland St. between Jones St. & Camino Colegio.
|
| City of Santa Maria - Sewage Treatment Plant - Phase II Sludge Drying Ponds |
|
Construction on new sludge drying ponds at the Santa Maria Sewage Treatment Plant on Black Road.
|
|
| City of Atascadero - Traffic Way Pavement Rehabilitation |
|
Pavement rehabilitation of Traffic Way between Olemeda Ave. and Via Ave.
|
| County of San Luis Obispo - Overlay of Various Roads 2007 (300363) |
|
Asphalt Concrete overlay of Chimney Rock Rd., O'Conner Way, Estrella, Cypress Mountain Rd., & Airport Rd. in northern SLO County.
|
| County of Santa Barbara - 2007/2008 Gallegly SAFETEA-LU Surface Treatment |
|
Surface Treatment Demonstration Project on San Miguelito and Palmer Roads in Lompoc, CA
|
| City of Atascadero - Traffic Way Sidewalk Construction |
|
Construction of pedestrian improvement on south side of Traffic Way, east of Olemeda Ave.
|
| Allan Hancock College - 2007 Parking Lot One Expansion |
|
Expansion of parking lot with 154 new parking spaces including area lighting.
|
| Caltrans - Hwy 166, Curve Realignment west of Cuyama (05-0A5504) |
|
Hwy 166 Curve Realign Horizontal Curve near Cuyama
|
| City of Goleta - 2007-2008 Pavement Rehabilitation Project |
|
Asphalt concrete overlay of various roads within Goleta, CA.
|
| County of Santa Barbara - Measure D & Prop 42 Overlay (810528) |
|
2006 / 2007 Overlay of various roads in Santa Barbara County
|
| Tajiguas Landfill - County of Santa Barbara |
|
Construction of new access road into landfill.
|
| Caltrans - Hwy 1 - VAFB to Soloman Rd (05-0N2904) |
|
Asphalt Concrete Overlay
|
| City of Paso Robles - Union Road |
|
|
This project completed in December 2006. The project included complete demolition and reconstruction & widening of Union Road between Riverglen Dr. and Kleck Rd.
|
|
|